Hume Industries (M) Bhd. was involved in a design and build contract (awarded by the Ministry of Education) for the construction of 100 units of Teachers Quarters located at Bandar Sri Permaisuri in Cheras, Kuala Lumpur. With a short construction period (12 months together with C.F approval), Hume chose to adopt a precast system
(precast: half slabs, wall panels and staircases)to ensure quality and timely completion of the project. The system has enabled us to have a
cleaner site with minimal formwork, fewer workers on site, more consistent
quality of works and the comfort of a shorter construction period. |