B.G. SLABS
   
   
DESCRIPTION APPLICATIONS

Hume B.G. Slabs consist of concrete grids with soil chambers and regularly spaced projections for wheel support at the surface. Grass is grown in the soil chambers so that a full established turf slab area has the appearance of a lawn: the surface area comprises 75 percent grass and only 25 percent concrete, while the load bearing portion of the slab is 88% concrete.

B.G. slabs provide a durable, all-weather surface that can be maintained as a grass field. This allows many options with regard to landscaping in built-up areas.

B.G. slabs are machine made using high quality dry mix concrete with a 28 day concrete strength or 30 MPa. The weight of each unit (595 x 400 x 110 H) is approximately 35 kg.

*BG is the German designation of these slabs, meaning �Beton/Grass� i.e. concrete/grass.

  1. Private Roads and Driveways.
  2. Car Park Areas.
  3. Boat Ramps.
  4. Road shoulders.
  5. River Beds and banks.
  6. Access roads in parks and gardens for heavy vehicles.
  7. Slope protection.
  ADVANTAGES
 

 

  1. Attractive grass covered areas.
  2. Firm surface for light and heavy vehicles.
  3. Significant reduction in reflected heat.
  4. Solar heat is dissipated through the soil.


 

STANDARD DIMENSIONS & PROPERTIES

BG SLABS

Dimensions � 595 L x 400 W x 110 H

Area Coverage � 4 pcs per square metre

Average Weight � 35 kg per piece

28 day cube strength � 30 N/mm2

 

 

FOUNDATIONS

The actual foundation required should preferably be determined by a local consultant who would take into consideration the bearing capacity of the material.

Foundations for light vehicles

In general it is only necessary to level the existing soil and apply approximately 20mm of sandy loam. 

Foundations for heavy vehicles

Areas intended for heavy traffic usually need deeper foundations. A typical example would be a 150mm deep sub-grade of ballast laid and packed over the sub-soil. On top of this, a layer of sandy loam approximately 20mm deep is required to ensure uniform load transfer to the sub-grade.

LAYING PROCEDURES

  1. Prepare the foundation as described above. Use barge boards and a screed board to level off sand. The sand should contain some humus as required.
  2. Slabs are laid in regular rows and levelled; no joining is required. In flat areas a slight gap 5 to 10mm may be allowed between adjacent slabs; using a suitable spacing board between rows.
  3. Filling and Seeding
  4. Use clean soil, level off approx. 30mm below the slab top. Add a mixture of sandy loam, grass seed and suitable lawn starter, keeping the final level to approx. 20mm below the slab top to allow successful germination. If filled too high, car tyres will crush the grass. It is always safer to keep the soil level low as you can easily top up later if required, but not vice versa.
  5. Mowing an Maintenance
  6. When using a small mower, cuts should be made diagonally across the slab. A mild fertiliser should be applied twice a year.

Installation on stream slopes

BG slabs laid on stream slopes effectively prevent erosion.

Mannings: n>0.026 providing high grid/water surface friction and thus reducing boundary velocity below erosion level.

45� slopes may be made secure and grass established. Every second or third unit should be stacked to provide initial stability. Units should be aligned with their long sides parallel with the stream flow.

 
It is our policy to continuously review and improve products and their design.
Information in this page is therefore subject to change without notice.
 
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ)
 
Hume Concrete Factories:
Beranang
Lot 6-9, Beranang Industrial Estate,
43700 Beranang, Kajang,
Selangor Darul Ehsan.
Tel: 03-8766 7831/2/3/4
Fax: 03-8766 7830
Kuantan
No. 46, Semambu Industrial Estate,
25350 Kuantan,
Pahang Darul Makmur.
Tel: 09-566 1427/1482
Fax: 09-566 3668
Pasir Gudang
Plot 244, Jalan Emas,
81700 Pasir Gudang,
Johor Darul Takzim.
Tel: 07-251 2695/3000
Fax: 07-251 2477
Prai
Lot 236-239, Lorong Perusahaan 8,
Prai Industrial Estate,
13600 Prai, Penang.
Tel: 04-390 6216/6488
Fax: 04-399 3421
Sabah
5th Mile, Tuaran Road,
P.O.Box 10339,
88300 Kota Kinabalu, Sabah.
Tel: 088-428 925/26
Fax: 088-422 473
 
Environmentals & Utility | Page 1 ]
Top
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ)