|
 |
 |
|
 |
| |
Features & Advanteges
Design
- Applicable to vertical wall from 3m to 6m
- Effective utilization of space
- Uniquely designed sloping Double-Tee section
- Structurally efficient shape with optimum use of materials
- Use of higher grade concrete for better strength and durability
Handling & Installation
- Stable structure for transport and handling
- Occupy smaller space during stacking
- Minimal installation cost - single crane operation involving small installation crew
- Minimum site equipment and accessories for installation
- Shorter construction period with speedy installation
- Single lift for full height wall panel of 2.4m wide, fast coverage
- Flexibility in negotiating horizontal curve
Associated Work and Finishing
- Wall panels once installed, backfilling may proceed as per work specification, upon achievement of concrete strength for in situ base
- Steel from finish on air face with a standard pattern of decorative vertical ribs, or horizontal ribs interspersed with wave form respectively
- Other customized finishes or patterns can be designed at norminal cost

Patent Pending
|
|
| |
| |
| Geotechnical |Page 1 | Page 2 | Page 3 | Page 4 | Page 5 |
| |
|
| Top |
 |
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ) |
 |
|
|
|
|