Advantages
  • Easy and fast erection, minimum installation crew needed.
  • Cost effective alternative to plywood formwork system.
  • Minimum propping required - less clutteringof the floor below to enable earlier access for other trades.
  • Customised size to project requirement.
  • High grade concrete and robust section, thus ensuring quality composite flooring in comparison to total cast in situ flooring.
  • Environmentally friendly with less construction waste being generated.
  • Cleaner and safer construction site, less health hazards to site workers.

Installation of HHS in progress-minimum site crew required


Cleaner and safer site
 
 
BUILDING SYSTEMS |Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7
 
Top
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ)