|
 |
 |
|
 |
| |
Advantages
- Easy and fast erection, minimum installation crew needed.
- Cost effective alternative to plywood formwork system.
- Minimum propping required - less clutteringof the floor below to enable earlier access for other trades.
- Customised size to project requirement.
- High grade concrete and robust section, thus ensuring quality composite flooring in comparison to total cast in situ flooring.
- Environmentally friendly with less construction waste being generated.
- Cleaner and safer construction site, less health hazards to site workers.

Installation of HHS in progress-minimum site crew required

Cleaner and safer site
|
|
| |
| |
| BUILDING SYSTEMS |Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 |
| |
|
| Top |
 |
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ) |
 |
|
|
|
|