Applications |
| Bridge crossing over highways, railways or rivers for pedestrian, motorcycles and services. |
| |
Features |
- Functional deck integrated with main structural element to form strong and rigid box girder
- Off steel form smooth finish
- Long span capacity from 15m to 29m
- Length customised to project requirement
|
| |
|
| |
| Advantages |
- Fast, safe and neat construction
- Minimum interruption to traffic
- Eliminate messy insitu work
- cost compared to conventional solutions
- Lighter selfweight by 40%, compared to conventional solution
- Very stable during handling and erection stages
- Factory produced to stringent standards
- High grade concrete and high durability
- Robust section with high torsional rigidity
- Optional aesthetic finishes can be incorporated onto the webs
- Services can be concealed inside the box
|
| |
| Design Considerations |
- Reinforced concrete design in accordance with BS 5400: Part 4: 1990
- Concrete characteristic strength
fci = 40MPa at transfer
fcu = 50MPa at 28 days
- Concrete cover to reinforcement = 30mm
- Loading:
~ Live loads = 5kN/m�
~ Superimposed dead load = 2kN/m�
- Prestressed class I structure
|
| |
Comparison with Conventional Solution
Conventional Solution � Pre-tensioned Beams |
|
| Method |
- Insitu foundation / supporting piers and accessories
- Install pre-stressed beams
- Install formworks and reinforcement for facial beam and deck
- Concreting, curing etc
- Dismantle formwork
- Finishing work � railing, tiles etc
|
| Problem |
- Messy sitework � special safety requirements needed owing to ongoing traffic below crossing
- Slow progress - weather dependent
- Uneconomical design - 2-stage composite & heavy
- Inconsistent quality of casts insitu works
|
| |
| Conventional Solution � Post-tensioned Beams |
|
| Method |
- Insitu foundation / supporting piers and accessories
- Install post-tensioned beams
- Finishing work - railing, tiles etc
|
| Problem |
- Sitework on casting and post-tensioning � space, stressing etc
- Slow progress - weather dependent
- Uneconomical design � heavy section, expensive cranage etc
- Requirement of site control
|
|
| Crossing |Page 1 | Page 2 |
| |
| Top |
 |
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ) |
 |
|
|
|
|