|
 |
 |
|
 |
| |
BEBO Development

Load Test of BEBO Arch
A modern precast concrete version of arch bridge construction was first developed in 1960's by a Swiss engineer, Dr. Werner Heierli. This unique BEBO arch bridge system uses soil-structure interaction and combines the advantages of the stabilizing influence of the earth fill surrounding the arch, the inherent property of arch geometry and use of precast concrete materials resulting in an aesthetically pleasant form with superior stability and strength.
After successful tests were conducted on a full-scale experimental structure, the first BEBO arch bridge was built on Swiss Federal Highway No. 1, in 1967. Since then, over 500 BEBO structures have been erected throughout the world. All remain in service and have required virtually no maintenance.
|
|
| |
| |
Bebo Arch | Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9 | Page 10 | Page 11 | Page 12 |
Page 13 | Page 14 | Page 15 | Page 16 | Page 17 | Page 18 | Page 19 | Page 20 | Page 21 | Page 22 | Page 23 |
| |
|
| Top |
 |
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ) |
 |
|
|
|
|