JOINTS
The hinge connection between the arch and foundation is formed by using a pocket keyway which allows for ease of construction and adjustments on site. The precast units are placed butting each other with a nominal 10mm - 20mm gap between each unit depending on type and span of arch profile used. Depending on the design requirements the joints between the arches can be sealed in various ways with sealant and backer rod, flexible mastic, or mortar and covered with filter fabrics.

SPANDREL WALLS
Precast spandrel walls are also available and can be customized to suit project requirements.


Installation of Spandrel Wall.

** Note: Design can also be customized to suit other special loading requirements e.g.: railway, special vehicles, etc.
 
 
Bebo Arch | Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9 | Page 10 | Page 11 | Page 12 |
Page 13 | Page 14 | Page 15 | Page 16 | Page 17 | Page 18 | Page 19 | Page 20 | Page 21 | Page 22 | Page 23
 
Top
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ)
 
/td>