Advantages
The numerous advantages of the BEBO arch bridges over alternative conventional bridge options can be viewed from various standpoins:
PROVEN QUALITY, DURABILITY AND STRENGTH
The BEBO system has been tested by Swiss, German, American and Australian authorities. For more than 30 years, the system has undergone vigorous refinements in many applications worldwide. The perfect and solid track record is the testimony to BEBO's structural integrity that the arches are built to last.
SHORTENED CONSTRUCTION TIME
A typical BEBO installation has the following schedule:
| ITEM |
WORKING DAYS |
| Excavation and Footings |
8 - 12 |
| Setting of Precast Components |
2 - 3 |
| Backfilling and Finishing |
5 - 10 |
| Total |
2 - 3 |
| Backfilling and Finishing |
5 - 10 |
| Total |
15 - 25 |
This fast track construction is made possible by reducing messy cast-in-situ works with efficient BEBO system.
ECONOMIC BENEFITS
BEBO arch system is a cost effective solution because:
- The design utilizes less materials
- Precast components can be handled and installed quickly
- Less installation labour (unskilled) is required
- The structure has longer service life with virtually no maintenance
|
|
| |
| |
Bebo Arch | Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9 | Page 10 | Page 11 | Page 12 |
Page 13 | Page 14 | Page 15 | Page 16 | Page 17 | Page 18 | Page 19 | Page 20 | Page 21 | Page 22 | Page 23 |
| |
|
| Top |
 |
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ) |
 |
|
|
|
|