Advantages
  • Excellent replacement for multiple cell culverts. Absence of an intermediate wall ensures an unimpeded water flow as a debris free inlet
  • Functionally shaped section to eliminate headroom problems
  • Use of high grade concrete and observance of quality control during production contribute to a highly durable structure
  • Maintenance free structure
  • Minimal installation cost - single crane operation involving small installation crew
  • Minimum site equipment and accessories for installation
  • Reduction in construction period with speedy installation
  • No major structural work on site
  • Stable structure for transport and handling
 
 
Crossing |Page 1 | Page 2 | Page 3 | Page 4 | Page 5
 
Top
HUME CONCRETE MARKETING SDN BHD (8411-T)
Level 2, Bangunan Pan Global,
No. 1A, Jalan Tandang,
P.O.Box 21, 46700
Petaling Jaya, Selangor.
Hot-line: (603) 7785 5282
Tel: (603) 7783 3068
Fax: (603) 7785 1823
E-mail: Adam Hussein (HIMB-PJ)